![]() Aerial view of part of the 1200 acre Puente Hills landfill site (largest in the United States) near the top of the photo. Near the bottom of the photo is the power generation facility (PERG). Look closely to see the landfill to see LFG collection pipes.
|
PROJECT PROFILE: PUENTE HILLS ENERGY RECOVERY FROM GAS (PERG) "WORLD'S LARGEST LANDFILL GAS-TO-ENERGY PROJECT" ESA designed and built the Puente Hills Energy Recovery from Gas (PERG) Plant, incorporating superior technical and economic design. Work on this fast-track, turnkey project was completed in 19 months, and the project began operating in October 1986. Since then, it has been producing 50MW of electricity for customers throughout the Los Angeles region, and has dramatically reduced Methane emissions - a particularly potent greenhouse gas. Technical Summary
Construction of the plant was completed in 19 months with 2 months allocated to operational start-up and equipment performance verification for each segment of the system. This resulted in a final acceptance in ESA engineered and designed the facility with a high efficiency steam cycle as just one of the major unique features of this plant. The plant is also automatically controlled from a central control room location utilizing an advanced distributed control system, configured by ESA. This maximized access to operational data and control while eliminating excessive wiring throughout the facility. Using the advanced control software developed by ESA, the plant can be operated with maximum efficiency and reliability. Project Performance
PROJECT PROFILE:
ESA as prime contractor working with PMSI redesigned and replaced two super-critical steam generators and rebuilt two 225-megawatt cross-compound high pressure turbine generator units simultaneously. In addition, all auxiliary equipment and systems were upgraded or replaced with the latest technology. State-of-the-art NOx and CO emission systems were designed and put into place, and the primary control system was replaced by installing a new central distributed control system, including steam turbine generator control systems. The project required only 16 month, operating 2 shifts per day, employing 735 men at the peak phase with over 270 subcontractors with 1,000 men total. The steam generator work consisted of redesigning and replacing all the high-pressure boiler components, associated equipment and flue gas ducting from the boiler to the stack. This work entailed major structural modifications to the existing boiler and ductwork structures, and included removing and replacing 1,200 tons of boiler pressure parts and 650 tons of flue gas ducting to accommodate a higher-pressure boiler gas path system from the fans to stack breeching. ESA developed an analytical model of the boiler and duct structure to validate reinforcing requirements in order to maintain complete structural integrity. The process included a three dimensional analytical model to identify affects the boiler structures and was used in removing and replacing new duct sections. The air pre-heater was rebuilt and replaced, as well as the control dampers and expansion joints, which consisted of 25 tons of material. The steam generator burners were replaced with 24 new low NOx burners for each unit. Four new 1,750 HP boiler fans were put into place with variable frequency drivers. In addition, the units post combustion controls were re-designed and installed to include both selective catalytic reduction (SCR) and oxidizing catalyst to reduce both emissions levels to be below 5PPM at 3% O2. ESA’s design and implemented of the SCR and CO systems established this projects as the cleanest burning plant in California to date. The SCR system included structural design and support of all SCR ductwork and support of the SCR housing within a new support structure, including 750 tons of ducting and 400 cubic yards of reinforced concrete foundations and structure steel to support SCR and CO systems. A new process was installed for ammonia production “on-demand”. The two 225 megawatt cross compound Steam Turbine Generators were disassembled, overhauled, and rebuilt. A complete overhaul of the Turbine Generator rotor and stator, including re-wedging, inspection/testing program, meggar, polarization index, El Cid, hi potential each of the four generators was completed. ESA implemented a new solid-state excitation system and a power stabilizer system, consisting of redundant controllers. The project also included replacing 28,000 tubes in two condensers, repaired four 500 HP vertical mixed flow circulating water pumps with an operation flow of 44,000 GPM, refurbishing 18 feedwater point heaters and eddy current test tubes, and in some cases being re-tubing the heaters. All auxiliary equipment was overhauled, upgraded, or replacement and tested. This included the deaerator system, equipment related to the turbine-generator block including boiler feed pumps, seal oil and hydrogen related equipment, condensate pumps, booster pumps, lube oil pumps, steam exhausters, and associated equipment. A new plant instrument air system was designed and put into place along with new air piping. ESA also removed, redesigned, fabricated and reinstalled approximately 50,000 lineal feet of pipe ranging from A complete overhaul of the Turbine Generator rotor and stator was performed, including re-wedging, inspection/testing program, meggar, polarization index, El Cid, doble and hi potential each of the four generators. A new solid-state excitation system and a power stabilizer system was also installed. Project Performance
|
|
|
|