SELECTED LIST OF ADDITIONAL PROJECTS
Westar Energy, St. Mary’s, KS
Implement Flue Gas Desulfurization (FGD) systems on three 800 MW CE units at Westar’s Jeffrey Energy Center.
AES, Huntington Beach, CA
Redesign and replace two super-critical steam generators and rebuild two 225-megawatt cross-compound high pressure turbine generator units. Design and integrate state-of-the-art NOx and CO emission systems.
Dayton Power & Light, Aberdeen, OH
Plant and Boiler overhead and FGD Balanced Draft conversion for four 650 MW coal-fired electric generating power plants from 2004 thru 2007.
City of Long Beach, Long Beach, CA
Municipal Waste to Energy Facility - Engineering, procure, construction management, permitting and testing including Thermal DeNOx System.
Carver Greenfield, Carson, CA
DeNOx Reduction for three circulating Fluidized Bed Systems utilizing hydrogen, ammonia and compressed
air systems.
Combined Cycle Power Plant, Frederick, MD
Engineering, design, equipment selection, specification, contractors selection, construction supervision of a combined 450 MW power generation plant.
Thermo Industries, Inc., Fort Lupton, CO
Engineering, design, equipment selection, specification, contractors selection, construction supervision of a combined 280 MW power generation plant.
Harper Lake Power, Harper Lake, CA
Engineering and construction, independent design review, equipment selection, and construction for two 80 MW power block facilities producing electricity from hot oil with natural gas.
PERG Landfill Gas to Energy, Los Angeles, CA
Puente Hills Landfill Gas Power Project 50 MW, engineering, procurement, construction management, start-up
and emissions optimization.
Monfort Cogeneration, Greeley, CO
Engineering, design, equipment selection, specification, contractors election, construction supervision of a 32 MW power generation project.
Alborada Power Plant, Guatemala
Engineering, design, equipment selection, specification, construction and start-up of a combined 100 MW power generation plant with integrated chiller system.
Montreal Generating Station, Quebec, Canada
Engineering and design, equipment selection, and specification of a repowering project increasing total generation from 300 MW to 800 MW.
Central Power Plant, Charleston, SC
Engineering, design, equipment selection, specification, contractors selection, construction supervision of a combined 450 MW power generation plant.
LNG Storage Facility, Eastern United States
Engineering and design for two 400,000 bbl LNG storage facilities each containing of LNG, a receiving dock, and two 65 million cubic feet per day vaporization system for gas distribution to central generating power plant.
Duquesne Light, Cheswick, PA
570 MW power plant boiler modifications, turn-key including start-up and training.
Central CA Irrigation District, Ceres, CA
50 MW Combustion Turbine Facility. Design and engineering of the combustion turbine and waste heat
boiler systems.
Northern California Power Authority, Lodi, CA
50 MW Combustion Turbine Facility. Design and engineering of the combustion turbine and waste heat
boiler systems.
Bisen Power Plant, Bursa, Turkey
33 MW Combustion Turbine Facility. Design, engineering of the combustion turbine and waste heat boiler systems.
LNG Liquefaction Plant, Central America
Engineering, design, and construction estimate for two LNG 65 million cubic feet per day liquefaction trains and LNG storage facility along with a shipping dock, fire protection and control system.
Guayana Project, Venezuela
Development, design, equipment and construction estimate for 300 MW combustion turbine heat recovery steam generator facility.
Mission Energy, Irvine, CA
Plant modification to 75MW geothermal facility to provide design modification to improve plant efficiency.
United States Navy, Miramar, CA
Steam plant modification to Miramar station central steam plant, permits, design, engineering and
procurement activities.
Austin Power Plant, Austin, Texas
Development, design, equipment and construction estimate for 200 MW combustion turbine facility.
LNG Storage Facility, Central America
Engineering, design, and construction estimate for an LNG storage facility containing 200,000 barrels of LNG,
a receiving dock, and a regasification system for gas distribution for a central generating power plant.
Kale Kan, Vernon, CA
Engineering, procurement, construction, and start-up for Central Steam Plant consisting of boiler, auxiliaries,
duct burner and SCR Reduction System.
United States Navy, El Toro, CA
Electrical high voltage engineering and design for the power distribution system for the entire naval base facility.
UCI Medical Center, Orange, CA
Engineering, permitting, and testing of low NOx high performance water wall boiler. 5ppm NOx (3% O2),
4ppm CO (13% O2)
Blount Constructors, Montgomery, AL
Engineering and construction technical support, independent review and inspection of design, equipment, and construction for a five 30 MW power block facilities producing electricity from hot oil with natural gas standby.
Empresa Electric, Guatemala
50 MW combustion turbine project, design review, control systems, engineering and design for boiler and waste water treatment control systems supply.
SCE SCR Project, Oxnard, CA
Engineering, design, equipment and construction to support a 480 MW facility retrofit with a SCR emissions reductions system.
Fluidized Bed Energy Project, Goose Lake, OR
Engineer, design, procure, fabricate, construct, start up and test a high temperature air combustion turbine
cycle, with high temperature convention exchangers. Design and fabricate a fluidized bed boiler with air pollution control systems.
LUZ Engineering, Corp., Boron, CA
Installation of gas burners modifications for SEGS Units III V totaling 90 MW. Design and modifications reducing the emission to approximately 85 PPM to the mid 50's without flue gas recirculation.
Colmac Energy, Mecca, CA
Design, furnish, and start up a Thermal DeNOx System for two 220,000 lb/hr waste circulation Fluidized
Bed Systems.
Hennepin Waste to Energy, Minneapolis, MN
Design, furnish and start up a Thermal DeNOx System for two 300,000 lb/hr projects each firing 606 tons/day
of municipal solid waste.
Fresno Biomass Energy Project, Windsor, CT
Design, furnish, and start-up of a Thermal DeNOx System for a 220,000 lb/hr biomass fueled circulating Fluidized Bed System.
Poso Project, Bakersfield, CA
Design, furnish, and start up of a Thermal DeNOx System with compressed air system for a 290,000 lb/hr coal fired power plant.
Jasmin Facility, Kern County, CA
Design, furnish, and start up a Thermal DeNOx System with compressed air system for a 290,000 lb/hr coal fired power facility.
Los Angeles DWP, Los Angeles, CA
Engineering, procurement, and construction management of retrofit Thermal DeNOx installation on 230 MW Facility at Long Beach/CA. Turnkey installation including one year optimization testing.
LUZ Engineering, Boron, CA
Gas Burner Modifications for SEGS 30 MW Unit No.2 to burn oil at 310,000 lb/hr along with improving
performance on three additional 30 MW units. Plant modification for 15 MW facility with 1,000,000 gallons
of fuel storage and handling.
City of Rolling Hills, Rolling Hills Estates, CA
Palos Verdes 15 MW Power project to provide engineering and construction technical assistance and independent review of design, equipment, and construction.
Queen of Angeles Hospital, Los Angeles, CA
Design and integrate Low NOx burner systems controls system, and a recirculation fans. Designed to lower NOx emissions to 9 ppm.
California Steel, Fontana, CA
Installation of seven boilers firing natural gas for steam production and distribution. Engineering, procurement, and construction management.
California Energy Commission, Sacramento, CA
ESA was selected by the CEC to perform expert analysis on the performance of a variety power
generating stations.
Energen, London, England
40 MW Waste-to-Energy Facility (1500 ton per day). Development, permitting, conceptual design, engineering
and design evaluation.
Applied Energy Services, Placerita, CA
Engineering to review plant performance, components and prepare heat balance on a 100 MW combined
cycle installation.
SCE SCR Project, Redondo, CA
Engineering, design, equipment and construction support of a 480 MW retrofit for a SCR emissions
reduction system.
PG&E Morro Bay, Redondo, CA
Engineering, equipment in support of a 360 MW emissions reductions retrofit using urea.
Public Service Company of Colorado, Denver, CO
Engineering and design for a NOx Reduction System with a compressed air system for a 100 MW power station.
Abu Dhabi Electrical Authority, Abu Dhabi
40 MW Gas Turbine Power Plant. Engineering, estimating, and balance of plant equipment pricing for two combustion turbines totaling 40 MW for the government of Abu Dhabi.
Southern California Edison, Rosemead, CA
Engineering studies to determine the conversion of steam generating stations to Industrial Cogeneration facilities and provided the basis to determine the effect of utility Co ownership of Cogeneration applications.
Department of Energy, Las Vegas, NV
Engineering to provide analysis of potential cogeneration processes for north Las Vegas Facility expansion. Developed the cogeneration technologies options using combustion turbines with heat recovery and gas fired internal combustion engine with waste heat recovery.
EPRI Gas Turbine Repowering
ESA was contracted by EPRI to support workshops related to gas turbine Utilization in the electric utility industry. These workshops included Gas Turbine procurement, specification, engineering, procurement, construction, Instrumentation, control, reliability, availability and maintainability, in support of industry and electric utilities.
Procter & Gamble, Baltimore, MD
Thermal Fluid Heating System and 3 Boiler Systems at Glycerine Refinery. Design, procurement, construction management, and start-up.
Dual Landfill Waste-to-Energy, Madrid, Spain
Dual Gas and Waste to Energy Power Project to generate 50 MW of electricity. Permit, conceptual design, equipment selection, engineering and design activities, along with construction cost estimate.
Stanislaus Waste to Energy. Stanislaus, CA
Waste to Energy Facility, engineering evaluation and recommendation Thermal DeNOx System and over plant air emissions testing.
Passaic County Resource, Recovery Facility, Passaic, NJ
Three 478 tons per day units for Waste to-Energy Facility. Engineering, procurement, construction management, permitting and testing for Thermal DeNOx System.
Long Beach Waste-to-Energy, Long Beach, CA
Three 117,170 lb/hr units at 660 psi and 752°F for a waste to Energy project, providing plant design improvements and betterment to plant operation.
Rocklin Biomass Project, Sacramento, CA
Design, furnish, and start-up a Thermal DeNOx System for a 220,000 lb/hr wood fired circulating Fluidized
Bed Systems.
Archibald Cogeneration Project, Pennsylvania
Consulting services and third party review of activities for the Archibald Cogeneration Project.
Powerline Oil Co., Santa Fe Springs, CA
Plant modification and burner changes including staged combustion/engineering, procurement, and
construction management.
Del Marva Capital, Baltimore, MD
Third party review of engineering and equipment for Glendon Resource Recovery Plant.
Coyote Canyon, Irvine, CA
Design and permitting for a operating NOx system for a 207,440 lb/hr boiler at 1360 psia and 955°F with a compressed air system.
Miller Brewing Co., Irwindale, CA
Design and evaluation of several cogeneration applications ranging from 8 MW to 50 MW.
Cogeneration Application Review
Review of cogeneration applications ranging from 100 KW to to 80 MW. Analyzed and evaluated system configurations including: I.C. engines, combustion turbines and combined cycle as well as steam and electrical generating facilities, including consideration of electric, thermal and regulatory requirements.
City of Irwindale, Irwindale, CA
Design and review of Thermal DeNOx system application for 4 units each at 200,000 lbs/hr units utilizing municipal solid waste.
Del Marva Capital, Burney, CA
Consulting and plant review of 31 MW waste wood power plant and Sawmill.
Dual Combustion Turbine Facility
Engineering and design, and cost estimate of an integrated dual combustion turbine generation system for
a 66MW generation facility, consisting of two combustion gas turbine generators, lube cooling, electrical and
control systems.
EFW Occidental Chemical Co., Niagara Falls NY
Design, operational review and engineering services for 2,000 ton per day cogeneration facility.
|
|